North Shore MA ADU Lookup
Find ADU zoning rules, permit requirements, and size limits for 25 North Shore Massachusetts municipalities.
25 of 25 municipalities
Amesbury
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Beverly
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Boxford
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Danvers
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Essex
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Gloucester
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Hamilton
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Ipswich
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Lynn
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Manchester-by-the-Sea
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Marblehead
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Middleton
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Nahant
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Newbury
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Newburyport
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Peabody
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Rockport
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Rowley
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Salem
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Salisbury
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Saugus
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Swampscott
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
Topsfield
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Wenham
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Prohibited
West Newbury
Max size: 900 sq ft
Types: Attached, Detached, Internal
Parking: 1 space
STR: Not addressed
Frequently Asked Questions
Do I need zoning approval for an ADU?
In most cases, no. Under the Massachusetts Affordable Homes Act (signed into law in 2024), ADUs up to 900 square feet are allowed by right on single-family lots, so no special permit or zoning variance is required. You still need a building permit, but the zoning hurdle has been removed for most homeowners.
What is the Stretch Energy Code?
The Stretch Energy Code is an optional, more stringent energy standard that over 250 Massachusetts municipalities have adopted. New ADUs in these towns must meet a HERS Index of 52–55, which means higher insulation, better air sealing, and more efficient HVAC systems. We build to these standards as part of every ADU project.
Will an ADU increase my property value?
Yes. Studies show that adding an ADU can increase property value by 20–30%, depending on the size, finish quality, and local market. Beyond resale value, an ADU generates rental income that can help offset your mortgage or fund retirement.
Why choose Don Perry Construction?
We specialize in ADU construction on the North Shore of Massachusetts. From ICF foundations to energy code compliance, we handle every phase in-house. You get a single point of contact with no juggling subcontractors, and a builder who understands MA permitting, the Stretch Energy Code, and local bylaws.
How long does it take to build an ADU?
Most ADU projects take 4 to 8 months from permits to move-in. The timeline breaks down into four stages: design and permitting (1–3 months), site work and foundation (2–4 weeks), framing and rough-ins (2–3 months), and finishes and inspections. We keep you informed at every stage.