Key Requirements
Permit Type
By Right
Permit Authority
Building Inspector
Local Terminology
Accessory Apartment
Max Size (sq ft)
900
Max Size (% of principal)
—
Size Rule
flat_cap
Attached Allowed
Yes
Detached Allowed
Yes
Internal Allowed
Yes
Parking Spaces Required
1
Transit Exemption
Yes
Short-Term Rental
Not addressed
Owner Occupancy Required
No
Design Review Required
No
Historic District Review
—
Energy Code
Stretch Code
HERS Rating Required
Yes
Max HERS Index (ADU)
52
Quick Summary
- Salisbury has an older "Accessory Apartments" bylaw (Article XI, Sections 300-57 through 300-60) that has NOT been updated to reflect the Massachusetts Affordable Homes Act effective February 2, 2025.
- Under state law, ADUs up to 900 sq ft are now allowed by right in Salisbury, despite the local bylaw still technically requiring a ZBA special permit. The special permit requirement is preempted.
- Several key local provisions are preempted by state law: owner-occupancy requirement, 20,000 sq ft minimum lot size, two parking spaces per dwelling unit, and the special permit/Planning Board consultation process.
- Provisions that likely still apply include the 900 sq ft maximum, 25% lot coverage limit, septic/Title 5 compliance, separate entrance requirement, and one ADU per lot limit.
- No updated ADU bylaw was found as of February 2026; the town appears to be relying on state law defaults.
Requirements at a Glance
| Requirement | Rule |
|---|---|
| Permit type | By right (state law; local bylaw special permit is preempted) |
| Max ADUs per lot | 1 |
| Max size | 900 sq ft (local bylaw aligns with state law) |
| Max lot coverage | 25% of lot area (total enclosed space, all buildings) -- may still apply |
| Attached allowed | Yes (state law) |
| Detached allowed | Yes (state law) |
| Internal allowed | Yes (state law) |
| Parking | 1 space max (state law; local 2-space requirement is preempted; 0 within 0.5 mi of transit) |
| Short-term rental | Not addressed in local bylaw |
| Owner-occupancy | Not required (state law preempts local requirement) |
| Lot size minimum | None (state law preempts local 20,000 sq ft minimum) |
| Septic | Title 5 compliance required |
ADU Questions in Salisbury
Can I build an ADU in Salisbury, MA?
Yes. Accessory dwelling units are allowed by right in Salisbury, MA, meaning you do not need a special permit or a zoning variance as long as the unit meets the town's dimensional rules. You still need a building permit from the Building Inspector. Salisbury calls these "Accessory Apartment."
How big can an ADU be in Salisbury, MA?
Salisbury limits an accessory dwelling unit to 900 square feet. State law protects ADUs up to 900 square feet on single-family lots, so a town cannot enforce a smaller cap on a protected-use ADU.
What types of ADU are allowed in Salisbury, MA?
Salisbury permits 3 forms of accessory dwelling unit: detached (a separate structure in the yard); attached (an addition to the house); internal (a conversion of existing space). Which one makes sense usually comes down to your lot, your septic or sewer situation, and whether you want the unit connected to the main house.
Does Salisbury, MA require extra parking for an ADU?
Salisbury's bylaw calls for 1 additional off-street parking space(s) for an ADU. Under state law, towns cannot require more than one space for a protected-use ADU, and no parking at all can be required within a half mile of transit.
Do I have to live on the property to rent out an ADU in Salisbury, MA?
No. Salisbury does not impose an owner-occupancy requirement, and state law bars towns from requiring it for protected-use ADUs. You can rent the unit without living on site.
What energy code applies to an ADU in Salisbury, MA?
Salisbury has adopted the Stretch Energy Code. That means a new ADU must hit a HERS rating of 52 or lower, which drives real decisions about insulation, air sealing, windows, and heating — typically an all-electric heat pump system. Budget for a HERS rater on the project from day one.
Based on Salisbury’s bylaw as last verified 2026-02-25. Bylaws change at annual town meetings — confirm with the Building Department / Planning Board before you build.